New I-475 Dorr Street interchange unveiled

The proposed new I-475 interchange at Dorr Street debuted at a public open house on December 14.

Hosted by the Lucas County Transportation Improvement District (LCTID) and the Ohio Department of Transportation, the session allowed area residents to review the engineering designs and ask questions.

A multi-lane roundabout interchange will be added on Dorr Street over I-475, with two entrance and two exit ramps constructed. Dorr Street will be expanded from two to four lanes between McCord and Holland- Sylvania roads, plus a two-way center left turn lane will be added.

 

To read more please log in or subscribe to the digital edition https://www.etypeservices.com/Welch%20PublishingID444/

Welch Publishing

Perrysburg Messenger Journal
130 Louisiana Ave.
Perrysburg, OH 43551

419-874-4491

Rossford Record Journal
130 Louisiana Ave.
Perrysburg, Ohio 43551

419-874-4491

Holland-Springfield Journal
130 Louisiana Ave.
Perrysburg, OH 43551

419-874-4491

Point and Shoreland Journal
130 Louisiana Ave.
Perrysburg, OH 43551

419-874-4491